Mortar silo or big bag?
The dry mortar has to get to the pump, and there are two ways of doing it: a silo filled with bulk material, or a bag emptier that takes big bags. The choice is less about output than about how much you will use, and how much headroom there is.
·
The three in the catalogue
- ST-3 — 2.5 tonnes of dry mortar, can be mounted on the SST 1 stand with telescopic legs, funnel and slide gate
- ST-5 — 1 600 litres, equivalent to 2.5 tonnes, unladen weight 450 kg, 200–400 kg/min
- TB 10 — 6.5 m³, equivalent to 10 tonnes, unladen weight 1 100 kg, 200–400 kg/min
The output is the same
Note that ST-5 and TB 10 are rated at exactly the same output: 200–400 kg/min. So the large silo does not feed the pump any faster than the small one — it just holds four times as much before it needs refilling.
So the question is not how fast you need the mortar, but how many refills you want on the job. It is a logistics decision, not a performance decision.
Overall height is often decisive
ST-5 is a big bag emptier with a discharge screw and a low overall height, which according to Ahlm makes it particularly suitable indoors or where headroom is limited.
TB 10 holds 6.5 m³ and weighs 1 100 kg empty. According to Ahlm's brochure, it is 3.85 m long, 1.90 m wide and 2.90 m high.
Power and handling
ST-5 is specified as 3-phase, either 400 V or 220 V, 50 Hz. For TB 10, Ahlm's brochure gives a 2.2 kW electric motor and a 16 A, 5-pin CEE connection.
ST-3 and ST-5 are handled with a container truck, forklift or construction crane. That determines where they can be placed, and whether they can be moved during the project.
Both are dust-tight. Ahlm states that its silo products have a conical outlet with a vibrating beam for complete emptying, but on the ST-5 the vibrator is an option used to make emptying easier. On the TB 10, the vibrating beam is built into the conical lower section, and according to Ahlm this design prevents blockages.
The silo must suit the pump
Check that the output of 200–400 kg/min suits the machine the silo is to feed, and sketch the filling height of the machine and where the silo can stand in relation to it before ordering either. See the guide to choosing a mortar pump for that side of things.
The machines this guide covers
More guides on construction and concrete
Floor grinders: width, grinding pressure and power supply
Three figures decide which floor grinder is right: how wide it is, how hard it presses on the floor, and what kind of power supply you have on site.
Read the guidePower on site: 1-phase, 3-phase and rated current
The power in kilowatts tells you what the machine delivers. The rated current in amperes tells you whether it can run where you are.
Read the guideConcrete dust extractors: why they match the grinder
The dust extractor for a floor grinder is not just any vacuum you happen to have. It is sized to the machine, and the product pages and the dust extractors'…
Read the guideNeed help choosing the right machine?